The Biogas plant of G&A Biogas and Algal Products producing ltd
Project ID: HU02-0006-D1-2016
Projektgazda/Projekt Promoter | G & A Biogáz és Algatermékeket Előállító Korlátolt Felelősségű Társaság/ G&A Biogas and Algal Products producing ltd |
Megvalósítási időszak/Implementation period | 2016.06.02- 2017.04.30. |
Hazai Projekt Partnerek/National Project Partner | - |
Donor Projekt Partner/Donor Project Partner | - |
Összköltség / Total budget (EUR) | 1 284 402 764 HUF/ 4 229 182 EUR |
EGT/Norvég támogatás összege / EEA/Norwegian Grant (EUR) | 629 357 354 HUF/ 2 072 299 EUR |
Our aim is to build a biogas plant in the area of 7728 Somberek Periphery 0115/21, which produces combined heat, and electricity through gas engine. Certain part of the produced heat of the gas engine supply the neighbouring pig farm buildings, the electricity, which is produced as well intends to sell within the frame of the Feed-in tariff system.
The exact location of the biogas plant:
7728 Somberek Periphery 0115/21
The fermented material can be used for fertilizer
The parts of the power plant
Storage for corn silo
Slurry mixer, and filling station
Charger for manure
Pre-digester
Digester
Separator station
CHP unit
The net Sum of the project: 1 309 962 002 Ft. -
As the preparation cost is not eligible based on the call for tender, the net eligible cost is: 1 289 122 965 Ft.-
Rights representing assets related to real estates (12): 474,238,732 Ft
Technical equipment, machinery and vehicles: (13) 776,270,259 Ft
Costs of services used (52): 38,613,974 Ft
Total (activities): 1,289,122,965 Ft
The timeframe of the project: 2016.06.02-2017.04.30